Form B - FPCI Summary Table
Priority Rank |
Score |
Site Number |
Barrier |
Stream Length Gained |
X - Reference Site Number(s) |
Prescription |
low |
18 |
1 |
und. |
250 |
replace with open bottom arch or larger dia. Round culvert |
|
low |
25 |
2 |
full |
175 |
larger culvert imbedded in stream bed (>1.06m) |
|
low |
24 |
3 |
partial |
500 |
imbed larger culvert or backwater existing culvert |
|
mod |
32 |
4 |
full |
1600 |
replace with open bottom arch or bridge |
|
low |
24 |
6 |
partial |
600 |
imbed larger culvert (preferred) or backwater |
|
low |
21 |
11 |
partial |
475 |
imbed larger culvert (preferred) or backwater |
|
high |
36 |
12 |
full |
1800 |
replace with bridge (preferred) or large open bottom arch |
|
low |
22 |
18 |
full |
100 |
backwater or imbed culvert |
|
mod |
32 |
23 |
full |
1100 |
imbed culvert |
|
low |
22 |
27 |
full |
50 |
imbed larger diameter culvert |
|
low |
22 |
28 |
full |
100 |
imbed larger diameter culvert |
|
low |
22 |
32 |
full |
450 |
replace with open bottom arch or bridge |
|
high |
40 |
33 |
full |
1100 |
replace with bridge |
|