Table of Contents

Executive Summary
1.0 Introduction
Figure 1. Location of Burrard Inlet Sites.
Figure 2. Location of False Creek East End Sub-Sites 1- 9.
2.0 Site Locations and Monitoring Schedule
3.0 Description of Sampling Methodology
4.0 Results and Discussion
Literature Cited
Appendix I. Summary of Proposed Water Quality Objectives for Burrard Inlet
Appendix II. Results of Water Column Sampling in Burrard Inlet 2000
Appendix III. Results of Sediment Sampling in Burrard Inlet 2000.
Appendix IV. Summary of sediment data collected at False Creek East sub-sites 1-9

Assessment of Burrard Inlet Water
and Sediment Quality 2000

Prepared by:
Burke Phippen
BWP Consulting
Prepared for:
Water Protection Branch
Ministry of Water, Land, and Air Protection
Victoria, BC
December 2001