BCSIS Project - Cathedral Lake
| Project Name: CATHEDRAL LAKE |
| Plot Count: 1 |
| Gathered Date Range: 840601 - 840601 |
| Contains lab analysis? YES (82) |
| Min/Max Lat: 49.059167, 49.059167 |
| Min/Max Long: 120.2, 120.2 |
| Centroid: Lat: 49.059167, Long:120.2 |
| Project Coordinators |
| VAN BARNEVELD |
| Surveyors |
| KOWALL |
| NTS_Mapsheet |
| 92H 1 |