City of Chilliwack:
As-Constructed Dike Drawings and Significant Reports and Studies
Overview Studies Relating to the City of Chilliwack Flood Control Program.
CHI-OM-M-5
(pdf 52mb) |
The Corporation of the District of Chilliwack |
|
O & M Instructions, Flood Control Works, VOL. 3, As Constructed Works - Improvements to East Dike, West Dike, Internal Drainage and Bank Protection - Various locations |
Willis, Cunliffe, Tait & Co., Dayton and Knight Ltd., Crippen Engineering Ltd., Bland Engineering Ltd., JW Wedler and Assoc. |
FRASER RIVER FLOOD CONTROL PROGRAM DESIGN REPORTS
2290-W
(pdf 2.9mb) |
The Corporation of the District of Chilliwack |
|
Vedder Setback Dykes Geotechnical Report |
Hillis Consulting Services, Nov 1978 |
W-2703
(pdf 16mb) |
The Corporation of the District of Chilliwack |
|
Chilliwack Flood Protection Dykes Upgrade, Geotechnical Report Chilliwack BC |
AMEC Earth and Environmental Ltd. |
VEDDER RIVER MANAGEMENT AREA PLAN
Vedder MgmtPl. (pdf 2.1 mb) |
The Corporation of the District of Chilliwack |
|
Vedder River Management Area Plan Sept 1983 |
The Vedder River Management Committee |
UMFW 2007 AS-BUILT DRAWINGS - East Dyke and Wing Dyke upgrades
Chilliwack UMFW 2007. (pdf 3.2mb) |
The Corporation of the District of Chilliwack |
|
East Dyke and Wing Dyke Upgrades 2007 Construction |
Dayton and Knight Ltd. Consulting Engineers |
|
|