Water Stewardship


City of Chilliwack:

As-Constructed Dike Drawings and Significant Reports and Studies


Overview Studies Relating to the City of Chilliwack Flood Control Program.

CHI-OM-M-5
(pdf 52mb)
The Corporation of the District of Chilliwack   O & M Instructions, Flood Control Works, VOL. 3, As Constructed Works - Improvements to East Dike, West Dike, Internal Drainage and Bank Protection - Various locations Willis, Cunliffe, Tait & Co., Dayton and Knight Ltd., Crippen Engineering Ltd., Bland Engineering Ltd., JW Wedler and Assoc.

FRASER RIVER FLOOD CONTROL PROGRAM DESIGN REPORTS

2290-W
(pdf 2.9mb)
The Corporation of the District of Chilliwack   Vedder Setback Dykes Geotechnical Report Hillis Consulting Services, Nov 1978
W-2703
(pdf 16mb)
The Corporation of the District of Chilliwack   Chilliwack Flood Protection Dykes Upgrade, Geotechnical Report Chilliwack BC AMEC Earth and Environmental Ltd.

VEDDER RIVER MANAGEMENT AREA PLAN

Vedder MgmtPl. (pdf 2.1 mb) The Corporation of the District of Chilliwack   Vedder River Management Area Plan Sept 1983 The Vedder River Management Committee

UMFW 2007 AS-BUILT DRAWINGS - East Dyke and Wing Dyke upgrades

Chilliwack UMFW 2007. (pdf 3.2mb) The Corporation of the District of Chilliwack

 

 

East Dyke and Wing Dyke Upgrades 2007 Construction Dayton and Knight Ltd. Consulting Engineers