Corporation of Delta:
As-Constructed Dike Drawings and Significant Reports and Studies
FRASER RIVER FLOOD CONTROL PROGRAM AS-CONSTRUCTED DRAWINGS
DEL-OM-M-3 (pdf 36.3mb) |
District of Delta |
|
Operations and Maintenance Instructions, Flood Control Works, Volume 3 - Book 1 AS CONSTRUCTED DRAWINGS, Contracts 1, 2, 4, 6, 6A, 6B, 7, 9, 9A, 9B |
Associated Engineering Services Ltd. |
DEL-OM-M-4 (pdf 32.3mb) |
District of Delta |
|
Operations and Maintenance Instructions, Flood Control Works, Volume 3 - Book 2 AS CONSTRUCTED DRAWINGS, Contracts 12, 15A, 18, 20 22, 23, Westham Island (contracts 1&2) |
Associated Engineering Services Ltd. |
DESIGN REPORTS
R-D1-1-10
(pdf 4.3mb) |
District of Delta |
|
Report on Flood Protection and Beach Retention Boundary Bay Village Area Delta BC |
Associated Engineering Services Ltd. |
|
|